Education & Worship Projects

Christian Brothers Mechanical Services supports all classes of non-residential HVAC needs, from small clients with one-time service needs to the largest facilities, in particular worship facilities and education HVAC projects. During our 30 years of business we have supported many of the most prestigious building projects in Los Angeles and throughout all of Southern California.

Following are examples of our work in the education and worship sectors. Click on the images below to view a larger display.

La Sierra University School of Business – Riverside, Riverside County

Fullmer Construction

Job Description: New Construction of new campus building, installed a complete HVAC System along with Building Controls Systems including: Large Air handlers on the roof, 80+ VAV boxes with re-heat, Boiler plant with pumps and BAC Net system with Tridium/JACE with complete graphics package, and training.

Vanguard University – Costa Mesa, Orange County

Lusardi Construction

Job Description: Design Build Project designed with our in house engineering team included a 3 story classroom addition to the existing building including a food service wing. Provided a Complete Mechanical System, Equipment & Ductwork in accordance with LEED Indoor Air Quality Guidelines, in a classroom building setting, 4- Roof Top Units, 16 Split Systems refrigeration line sets, 8 Exhaust fans, and air distribution, galvanized exhaust system for food service wing, provided Star-up of equipment and CAL-GREEN Commissioning assistance.

The Grove Community Church – Riverside, Riverside County

Tilden-Coil Constructors

Job Description: Multi-Phase- 56-acre campus in Riverside, the main building includes a sanctuary that holds 2,000 people. A full New Construction Design build Project including: Sanctuary, Youth Center, Classrooms, Gymnasium, Market Place and Food Service Kitchen supplied a Complete Mechanical System including Equipment & Ductwork in accordance with LEED Indoor Air Quality Guidelines, Exhaust fans, Piping, Insulation, with vibration isolation and noise control. Along with a complete Building Controls System for Optimum Efficiency, we provided start up and training.

Shepherd Of the Hills Church – Porter Ranch, Los Angeles County

Silva/BBC Joint Venture

Job Description: Design Build Project with Value Engineering Evaluations for a New 60,000 Sq (+/-) New Worship Building. Provide & install all new Roof Top HVAC System, Heat Pump Split Systems, Condensing Units, Sound Traps, Exhaust Fans, Vibration Isolation, Wall Louver and Air Dampers to the 2013 Cal Green Code, with building control systems.  

University of Redlands – Redlands, Riverside County

Tilden -Coil Constructors

Job Description: Large Central Plant Mechanical System with 4 pipe underground connections to two Buildings (the Music Auditorium and a 2 story Class Room) Installed to LEED Silver Specifications with Cold Water and Hot Water Fan Coils and DDC Controls.

Azusa Pacific University – Azusa, Los Angeles County

HMC Construction

Job Description: Design Build Remodel of 2 story classroom Lecture Building, installed complete education HVAC system with DDC controls. VAV with Boiler plant and hot water reheat.